Skip to main content

Coming soon — development planning is not yet available in Petrolytx. This page describes what we are building.

Development Planning for Multi-Well Pad Programs

Coming soon: Gantt-style scheduling, rig assignments, and integrated economics for multi-well pad programs — connected to the decline forecasts and well economics already in Petrolytx.

MCPRun this workflow from Claude or Cursor. Connect Petrolytx in one secure sign-in.Connect AI →
Payment method required14-day trial

Development Schedule

Illustrative sample

Rig 1Rig 2
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Pad A - Well 1

Pad A - Well 2

Pad A - Well 3

Pad B - Well 1

Pad B - Well 2

Pad B - Well 3

Total Wells

6

Program Duration

9 mo

Total CAPEX

$52.4MM

Built by reservoir engineers, for petroleum engineers

14-day trialPayment method requiredCancel anytimeAES-256 encrypted on Google Cloud

Stop Planning Development Programs in Spreadsheets

Manually coordinating rig schedules across pads

Gantt-style drag-and-drop scheduling with rig assignment tracking

No visibility into how delays affect project economics

Real-time NPV recalculation as you adjust the schedule

Capital allocation guesswork without integrated forecasts

Linked forecasts and economics update automatically with timing changes

Hours rebuilding schedules when priorities shift

Drag wells to reschedule and dependencies cascade automatically

Comparing alternative development sequences is tedious

Save and compare multiple schedule scenarios side-by-side

No standard format for presenting plans to management

Export Gantt schedules and capital timelines to PowerPoint

The Development Planning Toolkit We're Building

From well sequencing to capital allocation, everything your planning team will need

Gantt-Style Scheduling

Drag-and-drop Gantt chart for well-level scheduling. Define drill, complete, and equip phases with configurable durations and dependencies.

Rig Assignment Optimization

Constraint-aware rig scheduling with move times, mobilization windows, and crew availability for realistic timelines.

Integrated Economics

Each well links to its decline forecast and economic scenario. Adjust timing and watch NPV, IRR, and capital exposure update in real time.

Pad Development Planning

Group wells by pad and plan multi-well batches with pad-level constraints for surface readiness, permitting, and infrastructure.

Scenario Comparison

Compare alternative development sequences side-by-side and quantify the economic impact of accelerating or deferring pads.

Export & Reporting

Export Gantt schedules, capital timelines, and summary metrics to PowerPoint or CSV for stakeholder presentations.

Frequently Asked Questions

What types of development schedules will I be able to create?

Development planning will support Gantt-style schedules from single-well programs to multi-pad, multi-rig campaigns, with rig assignments, pad sequencing, and well-level timing via drag-and-drop controls.

How will the rig scheduling optimization work?

The planned scheduling engine will balance rig availability, pad readiness, and capital constraints to find an efficient drill order — set rig move times and crew availability, then let the optimizer sequence wells to minimize idle time.

Will drilling schedules tie into production forecasts and economics?

That is the design goal. Each well will link to the decline forecasts and economic scenarios already in Petrolytx, so timing changes update first-production dates, cash flow profiles, and project NPV.

How will schedule changes and delays be handled?

The planned Gantt chart will let you drag wells or pads to adjust timing, with dependencies cascading automatically, and multiple schedule scenarios to compare on-time vs. delayed timelines.

What export options are planned for development plans?

Planned exports include Gantt schedules and capital timelines to PowerPoint, plus well-level schedules as CSV for integration with drilling tracking systems.

Simple, Transparent Pricing

Start free. Upgrade when you need more.

Free

$0forever
  • 10 wells, 1 project
  • Basic decline curve analysis
  • CSV import
Create Free Account
For engineers

Pro

$149/mo
  • 250 wells, 10 projects
  • Economics & sensitivity analysis
  • Contextual analog discovery
  • Type curves (P10/P50/P90)
Start 14-Day Trial

Business

$299/mo
  • Everything in Pro
  • Capital Dossiers — cited decision memos
  • Unlimited wells & projects
  • Priority support
Start 14-Day Trial

See full plan comparison →

Start with Forecasts and Economics Today

Development planning will build on the decline forecasts and well economics already in Petrolytx.

Start 14-Day Trial

Payment method required to start your 14-day trial.